Instructions: Open https://www.datatrends.com.au/operations-sim.html and click ๐ Reset. Above the animated kitchen floorplan, click each of the three Flow Presets and record the live figures from the KPI Scoreboard and Tab 1:
| Flow Preset Tested in Simulator | Active Critical Path Chain & CPA (mins) | Order Lead Time (mins) | Effective Capacity (/day) | Warranty Defect Rate (%) | Daily Net Profit ($) |
|---|---|---|---|---|---|
| 1. โก Parallel CPA Flow (Default) | A → B → E → G (____ m) |
______ mins | ______ / 400 | ______ % | $_________ |
| 2. ๐ข Single-Line Serial Flow | A→B→C→D→E→F→G (____ m) |
______ mins | ______ / 400 | ______ % | $_________ |
| 3. โ ๏ธ Bypassed Fryer/QC (Flawed) | A → B → E (____ m) |
______ mins | ______ / 400 | ______ % | $_________ |
B: Grill = 8m, C: Toast Bun = 4m, D: Fry Chips = 6m). In Tab 1, drag the slider for C: Toast Bun from 4m up to 7m.
B: Grill at 8m, and drag D: Fry Chips up to 12m. Watch the pulsing red dashed line on the kitchen floorplan.
Instructions: Click ๐ Reset and open Tab 2 (Inputs). Set Transformed Resources to maximum (Artisan Wagyu $6.80, AI Forecast, 100% Bespoke Diet), then set Transforming Resources to minimum (3 Staff, Untrained Casuals, Cramped Single-Grill).
_______ / 400 (Lost: _______/day)_______ % | Profit: $_______
______________________
In Tab 3, drag 1. Volume to 650/day and 3. Variation in Demand to 3 (Extreme Footy Surge).
1. Effective Capacity drops from 391/d to: ________ / 650
2. Unmet Demand (lost orders/day): ________ / day
3. Adjust HR, Plant & Tech so Capacity ≥ 650/d:
• Winning Config: __________________________
• Resulting Daily Profit: $____________
Click ๐ Reset. In Tab 3, set 4. Visibility to 3 (Live Theatre Grill) so the divider wall opens on the canvas. Test HR Training in Tab 2:
• Test 1 (Untrained Casuals + Visibility 3):
CSAT = ______ % | Defect Rate = ______ %
• Test 2 (Certified Grill Masters + Visibility 3):
CSAT = ______ % | Defect Rate = ______ %
1. Select โ Move Stations (Drag) above the floorplan and drag stations B, C, D, E, F far apart to the edges of the floorplan. Record the new Motion Waste: +______ mins and Order Lead Time: ______ mins.
2. In Tab 4, test all three ๐ Process Layout presets. Which layout achieves the best fit for:
• High Volume (650/d), Low Variety (Set Menu): ____________________________________
• High Variety (Bespoke Menu), Moderate Volume: ____________________________________
Instructions: Open Tab 5: ๐ M-C-I Dashboard (KPI → Control → Improve) at https://www.datatrends.com.au/operations-sim.html.
Click ๐ Reset, open Tab 5, and switch Planned KPI Target Strictness (top-right of Tab 5) from HSC Benchmark to Six Sigma World-Class. Record how many KPIs are on target:
• Under HSC Benchmark Targets: ___ / 6 On Target | Under Six Sigma World-Class Targets: ___ / 6 On Target (___ KPI Breaches)
Select โ ๏ธ Crisis 3: Defective Burgers & Warranty Blowout from the top Scenario Bar, then open Tab 5. Record the initial metrics below, then click ๐ก๏ธ Fix Quality KPI: Auto-Reject QC + Grill Master Training in Stage 2 (Control) and record the result:
| KPI / Operational Metric | Before Corrective Action (Crisis 3) | After Clicking "๐ก๏ธ Fix Quality KPI" | Improvement / Variance Closed (Δ) |
|---|---|---|---|
| Warranty Defect Rate (%) | 13.8% | ______ % | -______ % |
| Daily Warranty Cost ($/day) | $880 / day | $______ / day | -$______ / day |
| Customer Satisfaction (CSAT) | 55% | ______ % | +______ % |
| Daily Net Profit ($/day) | $905 / day | $______ / day | +$______ / day |
Click ๐ Reset, open Tab 5, and inspect Stage 3: Improvement on the right. Click ๐ Run Kaizen Bottleneck Sprint (-1m) twice and record the impact:
• Initial Bottleneck Station: ________________ → After 2 Kaizen Sprints: ________________
• Order Lead Time: 13.8m → ______ m | First-Pass Yield: 96.9% → ______ % | Calculated CPA: 15m → ______ m
Open Tab 6 (๐งช Student Lab Missions & Outputs) on https://www.datatrends.com.au/operations-sim.html:
1. Complete the 6 Live Auto-Checked Lab Missions (left panel) and the 12 Experimental Simulation-Testing Questions (right panel).
2. Final Score Achieved: Live Lab Missions Verified: ____ / 6 | Experimental Quiz Score: ____ / 12